PlywoodSkiff.org

Mumblings and bumblings…
Skip to content
  • Home
  • About

Table of Contents

Chapter 1 – In the Beginning…
Chapter 2 – Checking the Center Line
Chapter 3 – Transom Installed
Chapter 4 – Installing the Chines
Chapter 5 – Installing Floor Timbers
Chapter 6 – Installing the Bottom Planks
Chapter 7 – Filling the Screw Heads
Chapter 8 – Fiberglassing the Bottom Joints
Chapter 9 – Installing the Keel
Chapter 10 – Transport
Chapter 11 – Skiff Roll Over
Chapter 12 – Framing the Skiff
Chapter 13 – Installing the Top Rails
Chapter 14 – Bow Enclosure
Chapter 15 – Dogwatch
Chapter 16 – Painting the Skiff
Chapter 17 – Splash Day!
Chapter 18 – Modifications
Chapter 19 – The Payoff!
  • Favorite Links

    • Boat Links
    • Bowdidge Marine Designs
    • Buskens Island Marine
    • Duckworks Magazine
    • Jim's Boats
    • Old Wharf Dory
    • Pacific City Dorymen
    • Shoestring Shipyard
    • Spira International
    • The Sound School
    • Wooden Boat Forum
    • Wooden Boat Publications
    • WoodenBoatBlog.com
  • Contact

    • Contact Site Admin
  • Admin

    • Register
    • Log in
    • Entries feed
    • Comments feed
    • WordPress.com
  • Navigation

    • Ch 1 Beginning
    • Ch 2 Center Line
    • Ch 3 Transom
    • Ch 4 Chines
    • Ch 5 Floor Timbers
    • Ch 6 Bottom
    • Ch 7 Filling
    • Ch 8 Fiberglassing Joints
    • Ch 9 Keel
    • Ch 10 Transport
    • Ch 11 Roll Over
    • Ch 12 Framing
    • Ch 13 Top Rails
    • Ch 14 Bow Enclosure
    • Ch 15 Dogwatch
    • Ch 16 Painting
    • Ch 17 Splash Day
    • Ch 18 Modifications
    • Ch 19 Payoff
    • Home Page
PlywoodSkiff.org
Blog at WordPress.com.
  • Follow Following
    • PlywoodSkiff.org
    • Already have a WordPress.com account? Log in now.
    • PlywoodSkiff.org
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Copy shortlink
    • Report this content
    • View post in Reader
    • Manage subscriptions
    • Collapse this bar